Parties to the Trial |
Case №, Subject of Claim (application, action) |
Amount of Claim, RUB |
Amount of penalty provision, RUB |
Expected amount of recovery, RUB* |
Trial Court Proceeding |
Review of Judgments |
Probability of Judgment for Claims in favour of the Company |
Claimant/Appellant |
Defendant/Interested Person |
Third Parties |
Court of Cassation/Appeal |
Court of Cassation (Arbitration Proceeding) |
Supervisory Authority |
Hearing Date and Outcome |
Appellant, Hearing Date and Outcome |
Appellant, Hearing Date and Outcome |
Appellant, Hearing Date and Outcome |
IDGC of Centre, JSC |
OJSC "YASK" |
|
(Case № А82-1485/2010-70) Collecting of indebtedness and interest |
5,842,022.15 |
5,785,774.08 |
11,627,796.23 |
Claim is satisfied. The decision from 9/24/2010 collects 5,842,022.15 roubles of indebtedness and 5,426,359.71 roubles of interest. New trial: stayed, before decision grantin on another case. |
1/20/2011, OJSC "YASK", the decision is left without change |
OJSC "YASK", 5/25/2011. Case is sent for a new trial in 1st instance. |
|
low |
KH Polyntseva |
IDGC of Centre, JSC |
|
А82-11365/2010-70, about material damage collecting |
697,510 |
|
697,510 |
16/02/2011 proceeedings stayed in connection with examination carrying out |
|
|
|
low |
Fedorovsky S.M. |
IDGC of Centre, JSC branch "Yarenergo" |
|
w/o No. About removal of obstacles in using property |
150,000 |
|
150,000 |
From 11/21/2011 the claim is satisfied by the decision regarding switching-off consumer TS, regarding indemnification is refused. |
IDGC of Centre, JSC, date is not specified |
|
|
low |
IDGC of Centre, JSC OJSC "YAGES" |
OJSC "Metallotorg" |
IDGC of Centre, JSC |
Case №А82-12753/2010-47, indebtedness collecting under the technological connection agreement |
1,404,694.2 |
|
0 |
10/18/2011 satisfaction of requirements OJSC "YAGES" abjudicated |
|
|
|
low |
OJSC "YAGES" |
СJSC "Novy Grad" |
IDGC of Centre, JSC |
Case a a82-10479/2011 about collecting debt receivable |
1,338,871.12 |
239,115 |
1,568,986.12 |
procedure is scheduled on 1/11/2012 |
|
|
|
high |
OJSC "YAGES" |
ZHSK Trufanova 30 building 2 |
IDGC of Centre, JSC |
Case a 82-14145/2011 collecting debt receivable |
592,656.18 |
13,162.35 |
605,818.53 |
The legal procedure is scheduled on 1/11/2012 |
|
|
|
high |
IDGC of Centre, JSC |
OJSC "YASK" |
|
Case А82-9085/2011collection of % for April 2011 |
|
1,500,981.74 |
1,500,981.74 |
By the decision from 11/22/2011 the claim is satisfied |
|
|
|
high |
IDGC of Centre, JSC |
LLC "Ryapushka" |
|
Case А82-6358/2011 collecting non-contracted consumption |
60,024.81 |
|
60,024.81 |
From 21/12/2011 claim is satisfied by the decision |
|
|
|
medium |
OJSC "MRSK Center" OJSC "YAGES" |
Komarov V.N., Morozov S.K. |
IDGC of Centre, JSC |
Indebtedness collecting under the technological connection agreement |
1,218,424 |
|
39,344.93 |
By judgement from 29/11/2011 the case is closed |
|
|
|
low |
OJSC "YASK" |
IDGC of Centre, JSC |
|
Case №А82-423/2011, Collecting of indebtedness and interest for 2008 |
22,887,237.14 |
4,894,980.79 |
27,782,217.93 |
Judicial hearing is scheduled on 2/9/2011 |
|
|
|
low |
IDGC of Centre, JSC |
OJSC "YASK" |
|
Case №А82-2606/2011, indebtedness collecting for November-December 2010 |
70,975,863.54 |
|
70,975,863.54 |
9/15/2011 — claim is satisfied |
OJSC "YASK", 12/8/2011, the decision is upheld |
|
|
high |
IDGC of Centre, JSC |
СJSC "Levashovo" |
|
Case А82-10797/2011, collecting cost for non-contracted electricity consumption under acts №76/23-4/022 from 1/27/2010, № 76/23-4/023 from 1/28/2010 |
185,101.08 |
0 |
185,101.08 |
Judicial hearing of 1/17/2012 |
|
|
|
medium |
IDGC of Centre, JSC |
SNT "Vesna-2" |
|
А82-10012/2011, collecting cost for non-contracted electricity consumption under acts 76/0034/VD/YU from 18.06.10, 76/0032/VD/YU from 26/05/2010. |
11,821.61 |
0 |
11,821.61 |
Judicial hearing is scheduled on 1/11/2012. |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
А82-7366/2011, collecting of the sum of indebtedness and a penalty fee under the works contract |
1,124,999.98 |
13,950 |
13,950 |
By judgement from 10/19/2011 from IDGC of Centre, JSC collected 13,950.00 RUB — penalty fee |
IDGC of Centre, JSC, 1/17/2012 |
|
|
low |
IDGC of Centre, JSC |
LLC "Powerlink" |
|
А82-11258/2011, about penalty under the agreement |
0 |
335,047.91 |
335,047.91 |
From 11/11/2011 case is transferred by determination of court on jurisdiction in Arbitration tribunal of Moscow, judicial hearing is not scheduled |
|
|
|
medium |
IDGC of Centre, JSC |
LLC "RegionEnergoMontazh" |
|
А82-11259/2011, about penalty fee collecting under the agreement |
0 |
214,198.5 |
70,000 |
Determination of court confirms from 23/11/2011 the settlement agreement according to which the defendant pays 70,000 RUB for benefit of the claimant, in the sum 144,198.50 RUB the claimant refuses other part of requirements. |
|
|
|
medium |
Skvortsova |
OJSC "Managing company of apartment houses of the Kirov district" |
IDGC of Centre, JSC |
w/o No., about damage compensation |
18,380 |
0 |
18,380 |
The decision from 21/11/2011 claim is satisfied at the expense of OJSC "Managing company of apartment houses of the Kirov district" |
|
|
|
high |
IDGC of Centre, JSC |
Kovalev A.V. |
|
Collecting for non-contracted electricity consumption (№ 761325b/VD/F from 4/27/2011) |
46,042.68 |
0 |
46,042.68 |
Correspondence the judgement from 12/20/2011 claim is satisfied in full |
|
|
|
high |
IDGC of Centre, JSC |
Suvorov V. P. |
|
Collecting for non-contracted electricity consumption (№ 760587/VD/YU from 4/20/2011) |
19,315.8 |
0 |
19,315.8 |
Correspondence the judgement from 12/16/2011 claim is satisfied in full |
|
|
|
high |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 08 PYAR-11 from 1/18/2011 |
0 |
64,573.36 |
64,573.36 |
Preliminary judicial hearing is scheduled on 1/16/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 05 PYAR-11 from 1/18/2011 |
0 |
9,345.83 |
9,345.83 |
Preliminary judicial hearing is scheduled on 1/16/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 439 PYAR-10 from 11/22/2010 |
0 |
10,643.13 |
10,643.13 |
Preliminary judicial hearing is scheduled on 1/16/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 378 PYAR-10 from 10/28/2010 |
0 |
11,040 |
11,040 |
Preliminary judicial hearing is scheduled on 1/16/2012 |
|
|
|
low |
Malehina E.S. |
ST "KERAMIK" |
IDGC of Centre, JSC, OJSC "YASK" |
About enforcement not to limit supply of electricity |
— |
— |
— |
12/15/2011 judicial hearing is postponed, date is not specified |
|
|
|
high |
Bondarenko I.Y. |
OJSC "UK apartment houses Lenin to r thow |
IDGC of Centre, JSC, OJSC "YASK" |
About collecting of damage, compensation of moral damage |
119,731.58 |
0 |
119,731.58 |
12/19/2011 judicial hearing is postponed on 12/26/2011 |
|
|
|
high |
MUP Nekouzsky mo "Power service" |
IDGC of Centre, JSC |
|
About sum collecting |
811,137.43 |
0 |
811,137.43 |
Judicial hearing is scheduled on 1/24/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under the agreement 22PYAR-11 from 2/9/2011 |
0 |
53,093.4 |
53,093.4 |
Preliminary judicial hearing is scheduled on 1/17/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 52 PYAR-11 from 2/2/2011 |
0 |
17,207.4 |
17,207.4 |
Preliminary judicial hearing is scheduled on 1/17/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 40 PYAR-11 from 2/18/2011 |
0 |
33,790.6 |
33,790.6 |
Preliminary judicial hearing is scheduled on 1/17/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 23 PYAR-11 from 2/9/2011 |
0 |
25,341.25 |
25,341.25 |
Preliminary judicial hearing is scheduled on 2/7/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 35 PYAR-11 from 2/4/2011 |
0 |
64,264.25 |
64,264.25 |
Preliminary judicial hearing is scheduled on 2/7/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 14 PYAR-11 from 1/27/2011 |
0 |
15,012.41 |
15,012.41 |
Judicial hearing is scheduled on 2/1/2012 |
|
|
|
low |
OJSC "Power system-holding" |
IDGC of Centre, JSC |
|
About penalty fee collecting under agreement № 498 PYAR-10 from 12/17/2010 |
0 |
21,604.22 |
21,604.22 |
Preliminary judicial hearing is scheduled on 2/7/2012 |
|
|
|
low |
IDGC of Centre, JSC |
OJSC "YASK" |
|
А82-4133/2011, indebtedness collecting for 2008 |
41,626,619.73 |
|
15,885,151.97 |
Judicial hearing is scheduled on 2/9/2011 |
|
|
|
low |
IDGC of Centre, JSC |
OJSC "YASK" |
|
А82-4723/2011, collecting of interest for January-February, 2011 |
|
2,574,159.03 |
2,574,159.03 |
11/8/2011 — claim is satisfied |
|
|
|
high |
OJSC "YASK" |
IDGC of Centre, JSC |
|
А82-6673/2011, damages recovery |
65,724.59 |
|
50,980 |
10/28/2011 — 50,980 roubles are collected |
|
|
|
low |
OJSC "YASK" |
IDGC of Centre, JSC |
|
А82-6457/2011, collecting of interest for 2010 |
|
945,101.11 |
924,855.32 |
11/22/2011 — the substantive provisions of the decision are declared, claim is satisfied at the amount of 924,855.32 roubles |
|
|
|
low |
OJSC "YASK" |
IDGC of Centre, JSC |
|
А82-6673/2011, about collecting of interest for using another’s money resources under the agreement of delivery of the electric power from 12/1/2006 № 58 |
0 |
75,580.03 |
75,580.03 |
From 11/24/2011 claim is satisfied by the decision. |
IDGC of Centre, JSC |
|
|
low |
IDGC of Centre, JSC (Gromov K.A.) |
popova M. B. |
|
Cost collecting b/d consumption the Act № 76 1114 from 11/24/2010 |
70,630.56 |
|
|
By judgement from 10/27/2011 year the claim abjudicated |
The legal procedure is scheduled on 1/19/2012 |
|
|
low |
IDGC of Centre, JSC |
UFAS on YAO |
Volkov D.A. |
Case № 03-03/113-10 about an antitrust violation |
|
|
|
By judgement from 10/26/2011 satisfaction of claim IDGC of Centre, JSC abjudicated. |
Procedure is is scheduled on 1/31/2012 |
|
|
low |
Beloskursky |
Administration UMR |
IDGC of Centre |
About ownership right acknowledgement on the land lot |
|
|
|
Hearing date is not specified |
|
|
|
medium |
OJSC "YAGES" (Sattarova T.V.) |
LLC "Falcon" |
IDGC of Centre |
А82-6195/2011 Collecting debt receivable |
715,061.42 |
|
|
By the decision from 10/17/2011 from LLC "Falcon" for benefit of OJSC "YAGES" collected 596,068.83 RUB |
|
|
|
medium |
IDGC of Centre |
Mr. Gorokhov |
|
№ 2-3081/2011vcollecting debt receivable |
0 |
|
|
Procedure date is not specified |
|
|
|
medium |
IDGC of Centre, JSC (А82-8395/2011) Nazhmudinov |
OJSC "YASK" |
|
Indebtedness collecting (disagreements on capacity January-May 2011) |
16,443,207.31 |
|
16,443,207.31 |
From 12/1/2011 claim is satisfied by the decision. |
|
|
|
medium |
Nikiforova OA (2-2096/11, Lenin d/c, Nazhmudinov) |
IDGC of Centre, JSC |
|
Collecting of damage and moral damage |
964,889.37 |
0 |
964,889.37 |
From 11/2/2011 claim is satisfied by the decision partially: collected 321,117.68 RUB |
The writ of appeal is declared by the claimant. |
|
|
low |
IDGC of Centre, JSC (case А82-12504/2011) (Nazhmudinov) |
LLC "SISTEL AUTOMATION" |
|
Penalty under the agreement |
0 |
149,599.32 |
149,599.32 |
Judicial hearing 18.01.12 |
|
|
|
medium |
Morozova/Mironenko (case № 2-2403/2011) (Nazhmudinov) |
IDGC of Centre, JSC |
|
Collecting of compensation of a moral damage |
1,000,000 |
|
370,000 |
From 08/12/2011 claim is satisfied by the decision partially: collected 370,000 RUB |
|
|
|
low |
IDGC of Centre, JSC (case А82-7955/2011) (Nazhmudinov) |
Management FS on supervision in wildlife management sphere in YAO |
Management FS on ecological, technological and nuclear supervision. |
Overpayment collecting |
205,384.09 |
|
205,384.09 |
Judicial hearing is scheduled on 1/31/2012 |
|
|
|
medium |
IDGC of Centre, JSC |
OJSC "YASK" |
|
Case А82-12560/2011, collecting indebtedness for August 2011 |
2,858,933.52 |
|
2,858,933.52 |
Judicial hearing is scheduled on 1/31/2012 |
|
|
|
medium |
IDGC of Centre, JSC |
OJSC "YASK" |
|
Case №А82-9375/2011, indebtedness collecting for June 2011 |
2,884,240.04 |
|
2,884,240.04 |
Judicial hearing is scheduled on 1/13/2012 |
|
|
|
medium |
IDGC of Centre, JSC |
OJSC "YASK" |
|
Case №А82-10798/2011, indebtedness collecting for July 2011 |
2,998,467.73 |
|
2,998,467.73 |
The substantive provisions of the decision 02/12/2011-is declared, claim is satisfied (the decision from 12/9/2011) |
|
|
|
high |
IDGC of Centre, JSC |
GU "Yaroslavl district KECH" |
|
Case А82-10139/2011, cost collecting for non-contracted electricity consumption under the act: № 76/23-2/01 from 1/28/2011 year |
1,937,301.23 |
|
1,937,301.23 |
Case it is transferred on jurisdiction, consideration date is not specified |
|
|
|
medium |
OJSC "YASK" |
IDGC of Centre, JSC |
|
Case А82-13227/2011, collecting of interest |
|
285,246.59 |
285,246.59 |
Judicial hearing is scheduled on 1/31/2012 |
|
|
|
low |
OJSC "YASK" |
IDGC of Centre, JSC |
|
Case А82-13882/2011, damages recovery |
259,062.9 |
|
259,062.9 |
Preliminary judicial hearing is scheduled on 1/11/2012 |
|
|
|
low |
IDGC of Centre, JSC (Gromov K.A.) |
UFAS on YAO |
Petrov |
Case №А82-11995/2011, Acknowledgement of the decision and prescription UFAS the void |
|
|
|
12/26/2011 decision substantive provisions, statement IDGC of Centre are announced, JSC is satisfied. |
|
|
|
high |
IDGC of Centre, JSC (Gromov K.A.) |
UFAS on YAO |
|
Case №А82-11994/2011 (Kapitonova E.A.), contest of judgement UFAS on YAO about penalty imposing |
|
13,982,197.03 |
|
12/26/2011 the decision substantive provisions are announced, satisfaction of the statement for contest of judgement UFAS on YAO refused |
|
|
|
low |
IDGC of Centre, JSC (Gromov K.A.) |
UFAS on YAO |
|
Case №А82-12005/2011 (Malahov V.D.), contest of judgement UFAS on YAO about penalty imposing |
|
13,982,197.03 |
|
court hearing is scheduled on 1/13/2012 |
|
|
|
low |
IDGC of Centre, JSC (Gromov K.A.) |
UFAS on YAO |
|
judgement contest about imposing of the penalty for an information unaccordance |
|
300,000 |
|
court hearing is scheduled on 1/20/2012 |
|
|
|
medium |
IDGC of Centre, JSC (Gromov K.A.) |
MUP Administration of Ilinsky rural settlement |
|
Cost collecting for non-contracted consumption |
403,898.93 |
|
403,898.93 |
The legal procedure is scheduled on 1/12/2012 |
|
|
|
high |
IDGC of Centre, JSC (Gromov K.A.) |
Office of Public Prosecutor of Lenin district |
|
Representation contest |
|
|
|
By judgement from 10/27/2011 the statements of IDGC of Centre, JSC abjudicated. The writ of appeal is being prepared. |
By cassation determination of judicial board on civil cases of the Yaroslavl regional court from 12/5/2011 satisfaction of the writ of appeal abjudicated. |
|
|
low |
IDGC of Centre, JSC (Semenov D.I.) |
Municipal authority Administration of Ilinsky rural settlement |
|
А82-9761/2011, cost collecting for non-contracted electric power consumption |
161,554.58 |
|
161,554.58 |
By the decision from 12/12/2011 the claim is satisfied in full |
|
|
|
high |
IDGC of Centre, JSC (Semenov D.I.) |
Municipal authority Welfare centre of Ilinsky rural settlement |
|
А82-9760/2011, cost collecting for non-contracted electric power consumption |
277,235.4 |
|
277,235.4 |
By the decision from 12/26/2011 the claim is satisfied in full |
|
|
|
high |
IDGC of Centre, JSC (Semenov D.I.) |
The municipal unitary enterprise of Rybinsk municipal district of Yaroslavl region "Municipal systems" |
|
А82-9399/2011, cost collecting for non-contracted electric power consumption |
220,441.2 |
|
220,441.2 |
By the decision from 12/2/2010 the claim is satisfied in full |
|
|
|
high |
IDGC of Centre, JSC (Semenov D.I.) |
Limited liability company "Pine" |
|
А82-9415/2011, cost collecting for non-contracted electric power consumption |
85,480.67 |
|
85,480.67 |
Judicial hearing is scheduled on 1/18/2012 |
|
|
|
high |
IDGC of Centre, JSC (Semenov D.I.) |
OJSC "Yaroslavl flour-grinding factory № 2" |
|
А82-10159/2011, cost collecting for non-contracted electric power consumption |
1,927,618.25 |
|
1,927,618.25 |
Judicial hearing is scheduled on 1/30/2012 |
|
|
|
high |
MUP "Water utility" (Semenov D.I.) |
OJSC "YASK", IDGC of Centre, JSC, OJSC "YARSK" |
|
А82-11257/2011, about compulsion to obligation fulfilment |
0 |
|
0 |
Judicial hearing date is not specified |
|
|
|
medium |
Polozkova N.S., Sergeeva V. A, Rau N.A., Rumyantseva I.A., Lvov S.A., BelYakova V. V (Semenov D.I.) |
OJSC "YASK", IDGC of Centre, JSC |
|
3-481/11, about compensation of material damage and compensation of moral damage |
65,269 |
36,327.7 |
101,596.7 |
By the decision from 11/23/2011 the requirement of claimants are partially satisfied (65,269 RUB on account of compensation of material damage and compensation of moral damage; 3,693.2 RUB duties, 32,634.5 RUB) |
12/9/2011 the petition for appeal is directed |
|
|
low |
Voronin N.A. (Semenov D.I.) |
OJSC "YASK", IDGC of Centre, JSC |
|
w/o No., about damage compensation |
14,300 |
|
14,300 |
Judicial hearing is scheduled on 1/17/2012 |
|
|
|
medium |
IDGC of Centre, JSC (Shcherbakova L.V.) |
LLC "Titan" |
|
А82-9033/2011, debt receivable collecting |
192,350.46 |
|
192,350.46 |
Judicial hearing is scheduled on 12/8/2011 |
|
|
|
high |
LLC "Atlux" (Shcherbakova) |
OJSC "Yargorelektroset" |
IDGC of Centre, JSC |
№А82-8747/2011, about settlement of disagreements at contract formation TP |
— |
|
— |
Judicial hearing is transferred, date is not specified |
|
|
|
medium |
IDGC of Centre, JSC (Shcherbakova L.V.) |
OJSC "Yargorelektroset" |
|
А82-10941/2011, debt receivable collecting |
1,614,240 |
|
1,614,240 |
Judicial hearing is scheduled on 1/20/2012 |
|
|
|
medium |
Denisov S.N. (Shcherbakova L.V.) |
IDGC of Centre, JSC |
|
w/o No., about damage compensation |
29,488 |
|
29,488 |
12/6/2011 judicial hearing is transferred, date is not specified |
|
|
|
high |
Blyablina I.A., Lapina T.M., Kurov A.A., Zhidkevich J.E., Agafonov A.E., Kuvarzin P.S., Pashaeva P., Denisov O.A., Kerimov G.M., Matveichev N.N., PolYakova N.P. (Shcherbakova L.V.) |
IDGC of Centre, JSC, OJSC "YASK" |
|
w/o No., About protection of the rights of consumers, restoration of street lighting |
770,000 |
|
770,000 |
By the decision from 10/21/2011 from IDGC of Centre, JSC collected 42,021.78 roubles, the Company is obliged to transfer a pole, to recover street lighting |
IDGC of Centre, JSC 01/12/2011, the decision of the first instance without change, appeal on error without satisfaction |
|
|
low |
Pomerantseva (Shcherbakova) |
Goncharenko, GD of the Ministry of Emergency of the Russian Federation on YAO |
IDGC of Centre, JSC |
w/o No., Collecting of the damage caused by a fire |
305,000 |
|
— |
Case stayed for examination carrying out |
|
|
|
high |
Vinnik (Shcherbakova L.V.) |
IDGC of Centre, JSC |
|
w/o No., collecting overpayment |
36,547.97 |
1,593.13 |
38,141.1 |
From 11/22/2011 the claim is satisfied by the decision in the sum 38,141.10 RUB |
IDGC of Centre, JSC |
|
|
low |
IDGC of Centre, JSC |
LLC "Yarchimpromstroy" |
|
А82-14264/2011, cost collecting for non-contracted electricity consumption under the act: № 76/23-19/088 from 5/31/2011 year |
418,820.71 |
|
418,820.71 |
Preliminary judicial hearing is scheduled on 1/12/2012 |
|
|
|
medium |
IDGC of Centre, JSC |
MU SKTS of Ilinsky rural settlement Uglichsky MA |
|
А82-14262/2011, cost collecting for non-contracted electricity consumption under acts: № 76\0204\60\VD\YU from 2/18/2011 year and № 76\0204\64\VD\YU from 3/17/2011 year |
1,508,022.67 |
|
1,508,022.67 |
Preliminary judicial hearing is scheduled on 1/13/2012 |
|
|
|
medium |
IDGC of Centre, JSC |
Administration of the Kuznechihinsky rural settlement |
|
А82-14257/2011, cost collecting for non-contracted electricity consumption under the act: № 76/0287/VD/YU from 2/15/2011 year |
25,122 |
|
25,122 |
Preliminary judicial hearing is scheduled on 1/13/2012 |
|
|
|
medium |
IDGC of Centre, JSC (Gromov) |
UFAS on YAO |
|
Contest of decision UFAS and orders on case № 03-03/110 (Atrohin) |
|
|
|
Date is not specified |
|
|
|
low |
IDGC of Centre, JSC (Gromov) |
Tamoyan Etc. |
|
Cost for non-contracted consumption (the Act 6НF from 8/4/2011 |
24,778.44 |
|
|
From 12/23/2011 the claim is satisfied by the judgement in full. |
|
|
|
high |
IDGC of Centre, JSC (Nazhmudinov) |
LLC "Beam" |
|
Cost for non-contracted consumption (the Act № 76/0020/VD/YU from 28.07.10 |
2,995.2 |
|
|
03/02/2011 |
|
|
|
high |
LLC "Salute Plus" |
IDGC of Centre, JSC |
|
Unjust payment collecting |
226,800 |
38,709.76 |
265,509.76 |
Judicial hearing is scheduled on 1/19/2012 |
|
|
|
low |
IDGC of Centre, JSC (Nazhmudinov) |
Rogushkin JUP |
|
Cost for non-contracted consumption (Act № 76/0612/VD/YU from 22/10/2010 |
15,596.75 |
|
|
16/01/2011 |
|
|
|
medium |
IDGC of Centre, JSC |
OJSC "YASK" |
|
Case №А82-14148/2009-2, indebtedness collecting for October-November 2008 |
39,589,419.29 |
14,162,564.9 |
51,755,742.71 |
10/31/2011 — claim is satisfied in the sum of 51,755,742.71 roubles |
OJSC "YASK", 1/25/2012 |
|
|
medium |
IDGC of Centre, JSC (Gromov) |
UFAS on YAO |
|
Contest of decision UFAS on case № 03-03/39-11 (Romanova E.G.) |
|
|
|
Judicial hearing date is not specified |
|
|
|
low |
IDGC of Centre, JSC (Gromov) |
UFAS on YAO |
|
Contest of decision UFAS on case № 03-03/85-10 (LLC "RPK") |
|
|
|
Judicial hearing date is not specified |
|
|
|
low |
IDGC of Centre, JSC (Gromov) |
UFAS on YAO |
|
Contest of decision UFAS on case № 03-03/53-10 (Ryabkov G. V.) |
|
|
|
Judicial hearing date is not specified |
|
|
|
low |
IDGC of Centre, JSC (Gromov) |
MUP RMR of "Kamenniki" |
|
Non-contracted consumption cost collection under act № 76/040/1 from 10/1/2010 |
94,139.35 |
|
|
Court hearing is scheduled on 1/30/2012 |
|
|
|
high |
IDGC of Centre, JSC (Gromov) |
Shopshinsky MUP housing and communal services |
|
Non-contracted consumption cost collection under act № 76/0150/VD/YU from 6/18/2011 |
17,956.35 |
|
|
Judicial hearing date is not specified. |
|
|
|
high |
Efimova N.V. (Shcherbakova) |
IDGC of Centre, JSC, OJSC "YASK" |
|
w/o No., about damage compensation |
7,790 |
|
7,790 |
the decision from 2/2/2011 the claim is satisfied at the expense of OJSC "YASK" |
|
|
|
low |