Home
ANNUAL REPORT 2011
twitter facebook
RU EN
  • IDGC of Centre in 2011
    • Limitation of liability
    • Address of the Chairman of the Board of Directors to Shareholders and Investors
    • Address of the General Director to Shareholders and Investors
    • Key Indicators
    • Key Events 2011
    • Events Occurring after the Reporting Date
    • About the Company
      • Market review, situation within the industry
      • Power transmission and technological connection market
      • Summary description of the Company
  • Financial and Operating Results
    • Operating Results Review
      • Operating Results Review
      • Electric power transmission
      • Technological Connection
      • Other activities
      • Interaction with customers
    • RAS Financial Results Review
      • Profit and Loss Statement
      • Basic financial ratios
      • Debt load
      • Credit ratings
    • IFRS Financial Results Review
  • Development Strategy
    • Mission
    • Strategic Vision
  • Investments and Innovations
    • Investments
    • Innovations
    • Information Technology
  • To Shareholders and Investors
    • Securities
    • Dividends
    • Share Capital
    • Registrar
    • Corporate Governance
      • Corporate Governance
      • Corporate Governance Rating
      • Disclosure
      • General Shareholders’ Meeting
      • Board of Directors
      • Corporate Secretary
      • Committees under the Board of Directors
      • The Chief Executive Officer
      • The Management Board
      • The Audit Commission
      • Remuneration of members of the management and control bodies
      • External auditors
  • Internal Control and Risk Management
    • The Internal Control System
    • Risk Management
  • Social Responsibility
    • Personnel
      • Manpower Policy
      • Personnel Structure
      • Training of Personnel
      • Skills Pool
      • Youth Outreach Concept
      • Social Policy
      • Organisation of health protection of the employees and improvement of occupational safety
    • Reliability and Emergency Forecast
    • Environmental Policy
  • Mass Media and Investor Relations
    • Mass Media Relations
    • Investor Relations
  • Appendixes
    • Statements in accordance with RAS
      • Auditor’s opinion
      • The Balance Sheet
      • The Profit and Loss Statement
      • Statement of changes in equity
      • Cash flow statement
      • Appendixes to Balance Sheet and Profit and Loss Statement
      • Explanatory Note
      • Final Report of the Auditing Committee
    • Statements in accordance with IFRS
      • Independent Auditors’ Report
      • Consolidated Statement of Comprehensive Income for the year ended 31 December 2011
      • Consolidated Statement of Financial Position as at 31 December 2011
      • Consolidated Statement of Cash Flows for the year ended 31 December 2011
      • Consolidated Statement of Changes in Equity for the year ended 31 December 2011
      • Notes to the Consolidated Financial Statements for the year ended 31 December 2011
    • Explanation of separate indicators
      • Financial Results
      • Operating Results
      • Average Number of Staff
      • Investments
      • Property Complex
      • Participation in Other Organizations
    • Report on Interregional distribution grid company of centre jsc, compliance with the code of corporate governance
    • Information on Large Deals and Related Party Transactions Closed in 2011

    Tools

  • Print this page
  • Popular pages
  • Interactive analysis
  • Materials

  • Short annual report PDF
  • Financial Statements XLS
  • Off-line version
  • All materials
Home / Investments and Innovations / Investments

Investments

In 2011, the volume of capital investments of IDGC of Centre, JSC amounted to
RUB 15.2 bn.

For the reporting period IDGC of Centre, JSC spent RUB 8.5 bn of its capital investments on retrofitting and renovating its facilities. RUB 6.6 bn were invested in new construction and building extensions during the reporting period. Fixed assets in the amount of RUB 13.9 bn were commissioned in 2011.

In physical terms, 4,630 km of power lines and 1,490 MVAMegavolt-Ampere. Unit of measurement of electrical capacity of transformer capacity were commissioned.

Detailed information on the volume of investments for 2009-2011 by the Company’s branches, segments, purpose-oriented programmes and measures is given in Annex No. 3 of this Report.

Actual volume of investments of IDGC of Centre, JSC in 2009-2011:

Period Disbursement (net of VAT) Commissioning
of fixed assets (net of VAT)
Financing (VAT included) Commissioning of capacities Capacity gain
bn RUB km MVA km MVA
2009 6.53 7.69 6.44 2,414 877 1,449 685
2010 12.23 10.01 12.50 4,155 1,050 2,777 770
2011 15.20 13.90 17.78 4,630 1,490 3,186 1,001

As the Company’s branches have transferred to RAB regulation, capital investments have been increasing since 2009. This is connected with the renovation of fixed assets, the purpose of which is the lowering of deterioration rates for equipment and infrastructure of the distribution power grid complex and the provision for growing consumer demand for electrical power, and the implementation of regional programmes in the regions of the Russian Federation.

In 2011, the Company implemented a number of major projects, information on which is presented below.

Branch Project name Investments (actual),

mn RUB

Commissioning of capacities, units of measurement
Belgorodenergo 110/6 kV Belgorod-110 SubstationSubstation, electric installation designed to convert and distribute electric power: renovation of 110 kV outdoor switchgear with replacement of equipment, panels of relay protection and automatic equipment, replacement of power transformers, replacement of 6 kV bays on the 3rd and 4th 6 kV bus bars 233 80 MVA
Belgorodenergo Purpose-oriented reliability enhancement programme 271 —
Belgorodenergo Assurance of reliability of electric power supply with renovation of 110 kV Khimzavod Substation 187 —
Bryanskenergo Renovation of 110/6 kV Sovetskaya Substation 103 40 MVA
Voronezhenergo Renovation of 110/10 kV No. 36 S/z Voronezhsky Substation with replacement of 6.3 MVA and 10 MVA transformers by 2×25 MVA transformers 121 50 MVA
Voronezhenergo Renovation of 35/10 kV N. Usman—1 Substation with transfer to 110 kV voltage class 152 50 MVA
Voronezhenergo Construction of 10 kV Distribution Substation for power supply of Siemens and Armax facilities with 10 kV feeding cable lines 165 13 km
Smolenskenergo Automated information and measuring system of commercial energy metering for the retail electricity market of Smolensk and towns of Smolensk Oblast 110 —
Tambovenergo Construction of 110/10 kV Substation PTF (poultry production unit in Inzhavino settlement) 106 32 MVA
Tambovenergo Construction of 10/0.4 kV Package Transformer Substation (poultry production unit in Inzhavino settlement) 104 44 MVA

More detailed information on measures and projects implemented in each branch of IDGC of Centre, JSC in 2011 is indicated in Annex No. 3 of this Report.

© 2012 IDGC of Centre
  • Contacts
  • Reference Information
  • Approved Abbreviations List
  • Sitemap
  • IDGC of Centre corporate web-site
Страница добавлена в мой отчет Ok
Page added to your report Ok